Case study · Q-Optimization · Calgary

An office tower,
tuned from its
own data.

A downtown Calgary office tower, optimized through our Q-Optimization platform. We read the building's data, ran fault detection and diagnostics on it, and gave the operator one short checklist. Nothing was bought and nothing was replaced.

22,263 m² Office tower Existing control system Whole building optimization 2026
$51,192
Savings found, per year: 9.7% of the building's energy bill
$20,385
Of that, already applied and measured in the trend data
$0
Capital. The savings come from settings on the existing control system
8weeks
From the first trend reading to the first verified saving
The building, from our site walkthrough
An amenity floor in the tower: tables and chairs by the windows, with exposed ductwork overhead
The building. 22,263 m² of office space, downtown Calgary.
Two variable speed drives for the supply fans, mounted side by side on the wall
Supply fan drives. Their schedule and pressure setpoint carry most of the saving.
Boiler room: a row of six boilers on a yellow kerb, with the insulated heating pipework above
Heating plant. The boilers that FDD found starting too often.
Chiller room: the centrifugal chiller with its control panel and insulated pipework
Cooling plant. The chiller, recorded with the rest of the plant.
Cooling tower on the roof, on its steel frame, under a clear sky
Cooling tower. On the roof, part of the cooling plant.
Plant room pumps with red motors on insulated pipework, behind yellow guard rails
Pumps. The plant pumps, seen on the walkthrough.
Insulated pipework and a pump in the chiller room
Pipework. Chilled water piping in the plant room.
Two gas-fired domestic hot water heaters with insulated pipework
Hot water. The two domestic hot water heaters.
Close view of one variable speed drive with its keypad and inspection labels
Variable speed drive. One for each supply fan, 200 HP each.
Tall metal louvres in the wall of the mechanical penthouse, seen from the roof
On the roof. Louvres of the mechanical penthouse.
Building automation graphic of the chilled water plant: pumps, chiller and cooling tower with their live readings
The BAS. The operator's own graphics. We read the same points, read-only.
Open amenity floor with exposed ductwork, seating and windows on two sides
Tenant space. The floors the plant serves.
The process

Easy on the
building team.

The operator's part was one checklist of fifteen items. All fifteen were answered the day it was sent. Everything else ran on the platform, where the owner and the operator could follow each step.

  1. 01ConnectRead-only access to the control system, the utility bills and the last energy audit. Nothing is installed.
  2. 02Collect21 control points recorded every 10 minutes: fans, schedules, setpoints, boilers, chiller.
  3. 03DetectFault detection and diagnostics (FDD) checks the data against a library of 17 rules.
  4. 04DecideOur engineers turn what matters into findings, each with a dollar value and a plain instruction.
  5. 05ApplyThe operator answers each item: applied, will apply by a date, or not now. No site shutdown.
  6. 06VerifyEach change is confirmed in the trend data, then counted. Savings are measured, not assumed.
What the data showed

Three settings,
most of the saving.

Eight findings in all. Three of them carry the dollars, and each is a setting the operator can change from the control system's front end.

Applied and measured · $20,385 a year

Fans started at 04:30. People arrive after 06:00.

The air handler schedule moved from 04:30–18:30 to 06:00–18:00. The trend shows 12 running hours per weekday where there were 14, on every weekday since the change.

Agreed with the operator · $23,012 a year

Supply fans held at full speed.

The duct static pressure setpoint was fixed at 325 Pa, so the fans never slowed down. It is being lowered in steps, then reset on demand.

Identified, for later · $7,795 a year

Boilers firing in warm weather.

The heating plant ran for 220 of the 302 hours recorded above 16 °C outside. A warm-weather lockout is on file for the operator to take up when it suits the plant.

Q-Optimization verification screen: the air handler week with the early morning hours cut, and a before and after chart of running hours per weekday falling from 14 to 12
The first measure, verified on the platform. Left: the hours cut from each weekday morning. Right: air handler hours per weekday in the trend, before and after the operator's change.
Fault detection and diagnostics

What FDD
added.

The rule library was run again after the review. In one two-week run it flagged three boilers starting far more often than they should, a wear problem that no utility bill shows. It also closed a comfort fault on two floors once the readings came back into range, without anyone having to chase it.

010203040505678910111213141516171819November 2026Rule threshold: 12 starts a dayBoiler 1Boiler 2Boiler 3Starts per day
Boiler starts per day from the building's own trend data, 5 to 19 November 2026 (the first and last days are part days). Counted at 10-minute readings, so the real number is higher. Anything above the dashed line trips the rule.
Q-Optimization fault list: 17 checks run on 14 days of data, 3 active faults on the heating plant, and one zone comfort fault cleared
How the same result reads on the platform: each fault ranked by energy, comfort and urgency, with a plain diagnosis. An engineer checks each one before it becomes a finding.
The result

A return with
no capital behind it.

$51,192 a year against an energy bill of about $528,000, from changes that cost nothing to make. The first $20,385 was in the trend data eight weeks after recording began.

Where it standsPer year
Applied and verified in the trend$20,385
Agreed with the operator, dated$23,012
Identified, for later consideration$7,795
Total found$51,192
  • No new equipment and no capital request
  • One checklist for the operator, answered in a day
  • Every saving tied to a change seen in the building's own data
  • The rules run again on new data, so a setting that drifts back shows up

The building, its owner and its people are not named. Figures are as recorded on the Q-Optimization platform in November 2026. "Measured" means the change was seen in the trend data and the saving calculated from it; "agreed" and "identified" amounts are engineering estimates until they are verified the same way. Study fees are not shown.

See what your
building's data says.

Read-only access and a few weeks of trends are enough to start.